Laserfiche WebLink
A • C <br />-4 <br />FURTHER, 1F CHII~IIJEY KOCK CURL DESIRES TU PURSUE THL DELEIIUIJ OF THE <br />SPOIL FILL TOEURAIN, THE COMPANY SHALL PREPARE AN AP PRUPRIATE <br />PROJECTION OF THE POST-1411J1NG 41ATER TABLE WITHIN THE BACKFILLED <br />SPOIL. THIS ANALYSIS, 1NCLUDING h10DELING OF THE POST-h11fJ1NG WATER <br />TABLE, SHALL BE SUBI.IITTED TO THL DIVISION FUR REVIEW AIJD APPROVAL. <br />CONSTRUCTION OF Tf1E SPOIL PILE TOEDRAIN SHALL COIJTINUE AS APPROVED <br />UNTIL THE DIVISION SPECIFICALLY AP PRUNES AN AP PRUPRIATE PLAN <br />REVISION, IN WRITING. <br />23. WITHIN iBU DAYS OF PERMIT ISSUAPJCE, CHIhIfJEY ROCK COAL t4UST SU614IT A <br />COMPREHENSIVE PLAN TU BE II4PLEMEIJTED DURING RECOfJSTRUCTIOIJ OF THE <br />EPHEMERAL URAINAGE. THE PLAN I.1UST IJJCLUUE, BUT tJUT BE LIMITED T0, <br />THE FOLLOWING 1NFORtgAT]ON: <br />1. SILE OF URAINAGE AREA; <br />2. ESTIJ4ATED PEAK FLOW FOR A 25-YEAR EVEtJT; <br />3. GRADE OF URAINAGE; <br />4. SIZE OF RECUiJSTRUt,TEU URAINAGE; <br />5. MATERIAL TU BE USED TO LINE THE URAlUAGE; NfJU <br />6. A MAP DEPICTING THE LOCATION OF THE RECONSTRUCTED URAINAGE AND <br />SHOWING WHERE [1 CONNECTS WITH THE UIJUISTURBEU PURT101J OF THE <br />URAINAGE. <br />24. CHIPINEY ROCK COAL J•1UST SUBIdIT UUCUMEIJTATION THAT APPROVAL HAS BEEN <br />GRANTED FROM WESTERN SLOPE GAS COh1PANY BEFORE THE HAUL ROAD CROSSES <br />THE PIPELINE. <br />t <br />