Laserfiche WebLink
• 1 <br />Mr. Jay Stewart May S, 1981 <br />Page Two <br />I further feel that you have made an inaccurate contention that inspectors <br />present inconsistent views when in the field and in inspection reports. <br />Should you wish to accompany us on each monthly inspection Z believe that <br />you would find consistency and continuity in concerns and topics discussed <br />with the operator. <br />Let me conclude by stating that the Division is always willing to work <br />with operators to alleviate concerns and problems in a professional <br />manner. However, operators have a responsiblity to notify the Division <br />when concerns arise and act to alleviate them. Z hope this correspondence <br />will open a clear line of communication between Walden Coal/Flatirons <br />and representatives of the Division. <br />Sincerely, <br />Michael S. Savage <br />Reclamation Specialist <br />MSS:jmj <br />