My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56364
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:47 PM
Creation date
11/23/2007 11:23:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
General Documents
Doc Date
2/21/2001
Doc Name
MEMO TO FILE VARIOUS HENDERSON MILL CLIMAX MOLYBDENUM CO PN M-1977-342
From
ALLEN SORENSON
To
FILE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiu iu <br />MEMO TO FILE <br />Date: Wednesday, February 21, 2001, 11:51 a.m. <br />Specialist: Allen Sorenson Signed: i ^' `~`~~/ <br />Subject/Operator/Operation/File No. Various. Henderson Mill, Climax <br />Molybdenum Company, Permit No. M-1977-342 <br />Type of Interaction: Meeting Phone Other <br />Person(s) contacted and affiliation: Erich Bower. Environmental Coordinator, Henderson M1till, <br />303/569-3221 ext. 2214 <br />Summary and Resolution oI Interaction: Discussion of the following three topics: <br />Henderson plans [o install phase one of ground water interceptor system during construction season 2001. URS is <br />completing design for approximately eight interceptor wells and a series of 1 inch moni[orin; piezometers. A <br />technical revision to incorporate the interceptor wells and monitoring network will be provided. <br />RFP for summer 2001 topsoil salvage operations in [he tailing basin will be prepared in March 2001. DMG will <br />inspect site this spring to review topsoil stockpile locations and determine if additional permitting is necessary. <br />Topsoil may be pushed into temporary windrows or placed in long-term stockpiles depending on cost and logistics. <br />DMG is concerned that salvage operations proceed such that poorer quality subsoil is not mixed with A-horizon <br />material. DMG will schedule inspection to observe topsoil salvage operations. <br />Henderson is proceeding to finalize a plan to accept delivery of biosolids for use as a reclamation soil amendment. <br />Will obtain permit from Health Department and TR with DMG. Currently looking at accepting only grade A, <br />composted material from the producer. This material would have no restrictions on where it could be used. <br />c:\windows\personal\henderson various MTF.doc <br />CC ~. ~~w ~ ~E~ <br />v~~ ~~Q C~~rr, c <br />
The URL can be used to link to this page
Your browser does not support the video tag.