Laserfiche WebLink
,: <br />blue <br />ribbon <br />coal <br />company <br />February 10, 1983 <br />Robert Liddle <br />Reclamation Specialist <br />Colorado Mined Land Reclamation <br />1313 Sherman Street <br />Denver, CO 80203 <br />RE: Stipulation Response Document <br />Permanent Program Permit C-047-81 <br />Dear Mr. Liddle: <br />iiiiiiiiiiiiiiiiiii <br />blue ribbon coal company <br />p. o. box 58 <br />delta, Colorado 81416 <br />(3031874-7561 <br />RECEIVED <br />FEB 141983 <br />nAINED LAND RECLAMATION <br />COLO. DEPL OF CIATURFJ. NESOURCE~S <br />The permit issuance occurred December 9, 1982. The Division's decision <br />to approve contained three stipulations. Information was required for Stipu- <br />lation 1 and 2 within 30 days of permit issuance. Stipulation 1 requires no <br />further action; therfore, it is included in this response document without <br />change. Stipulation 2 required a statement that an area of approximately 1 <br />acre near pond 1 would be protected. This statement was made previously but <br />a possibility existed that back fill requirements for stabilizing the lower <br />mine bench for final reclamation contour could require fill in this previously <br />disturbed riparian area. Upon completion of the final reclamation slope design <br />it has been determined that no fill is required in this area. This slope design <br />is part of Stipulation 3. The Stipulation 3 response was required within 60 <br />days of permit issuance. The attached five copies of the Stipulation Response <br />Document include this information. <br />If you have questions as this document is being reviewed, please call <br />Marv Adam at 874-7561 or myself if Marv is unavailable. <br />Sincerely, <br />Blue Ribbon Coal Company <br />By: North Fork Energy Corp. <br />A Managing General Partner <br />By: 1~1.9.~~ S . ~. . <br />William S. Tate, P.E. <br />Senior Engineer <br />/lr <br />Attachment <br />cc: Marv Adam <br />Julian Mitchell <br />