Laserfiche WebLink
:> <br />+ STORMWATER ANNiJAL REPORT -METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVII20NMENT <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />Make enough copies of form for each reporting year. Check box if this is a <br />new name, address, etc. <br />Permittee (Company Name): Gulo'~z.F~c ~~ v~si~~/ oP /7i...c~/f!s d- G-e~•t~u--y ^ <br />Facility Name: C~'*` ~~~~/ Q~c c.,,ti,,,n~.,i c~....srn~~n~-.~ !/toJ«rs ^ <br />Mailing Address: / 3 f 3 SNe ~r,~r," sr" "~ ,~/ f i74.,.~ c iZ ^ <br />CvlvR~lJU S~v9-~S <br />Facility Phone Number: (3~3 ) 86 6 -35'6 7 ^ <br />Permit Certification No. COR-04 d ,~ O ~, <br />Reporting Period: Jan. 1-Dec. 31, iii O O (Form is due by Feb. IS of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall~ompliance with the SWMP. (Include here a summary of any measures <br />taken to comply with your Stormwater Management Plan (SWMP}, to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), employee training, spills, other <br />problems encountered, etc. How is your plan working?) <br />Were changes made to your SWMP? L~ No ^ Yes -Describe changes on a sepazate sheet. <br />B. A luminary of each comprehensive stormwater facility inspection made, including date. frndines. and <br />action taken. (The permit requires at least two comprehensive facility inspections per yeaz for active <br />mines, with different requirements for other sites -see page 11 of the permit. Include here a summary of <br />those inspections, plus any other comprehensive inspections made. It is not necessary to snmmariZe day- <br />to-day inspections, unless significant problems were noted.) <br />First Inspection -Date S/ ~luU Findings, and action taken: <br />y ~lil'Se .See A'TTq-c~.t/) ~C/~a/L% <br />Note -form may be reproduced Page 1 of 2 a}9i96min <br />