My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56318
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:12 PM
Creation date
11/23/2007 11:21:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
8/17/2007
Doc Name
Letter Regarding Coal Bond Compliance Inspection
From
DRMS
To
Hydro-Environmental Solutions Inc
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.., ~ ` ~tECEIVED <br />~• FEBli1980 <br />HENRY A. BASKL Ground Water Consultant +~-~ <br />- ,~ . <br />1586 S. Robb Way Denver, Colorado 80226 Telephone (303) 985-1141 <br />September 15, 1979 <br />Infiltration Gallery Construction Specifications <br />Hayden, Colorado <br />1. A trench shall be dug to bedrock (estimated depth 15 to lE feet), <br />with a minimum width of one Coot and a length of 4S feet. <br />2. Midway between the ends of the trench, the bedrock shall 6e <br />excavated a minimum o: three feast to allow the vertical pipe <br />bottom to be set three feet below the top of the bedrock. Thus, <br />the submersible pump motor can be installed so.that the pump <br />intake is at the. horizontal drain elevation. ~~ <br />3. nuring construction o! the trench or after it`~as been dug <br />(contractor's option), the trench shall be pum~ied out at a rate <br />of 150 gpW for 24 hours to determine the infloq rate. If the ; <br />trench cannot produco 150 gpm, it shall be pumped at it's maxi- <br />mum rate. The pump discharge shall be piped Lway frota tho <br />trench to an existing ditch at least 150 feet away. The dis- <br />charge rato and pumping level during pumping shall beymeasured <br />•every 15 minutes for the first 2 hours, and every k hour Por <br />the romaining time. <br />4. If the pumping rate is adequate, as determined by the owner, <br />the trench shall be completed as an infiltration gallery in <br />the following :,ceps. <br />5. Pirst, the vertical pipe shall be installed with provisions <br />for pumping at a rate of 150 gP4 with a pumping level one foot <br />above the horizontal drain. <br />• Water Supply • Dewe arln/ • ReeAuplnp • Speo4/ In reef!/etions <br />
The URL can be used to link to this page
Your browser does not support the video tag.