Laserfiche WebLink
i • <br /> ITEM 3. - PROOF OF WATER <br /> The only water required will be potable water for employees, which will be supplied from the <br /> applicant's municipal system. Since the applicant is the Metropolitan District, which also includes <br /> the water supply in its jurisdiction, it is not felt that a separate letter is required verifying that they <br /> will supply water to their own operation. <br />