Laserfiche WebLink
<br />Attachment A of Federal Permit C4-031 Termination, May 1988 <br />Conditions of Mining Plan Approval <br />Page 4 of o <br />E}QiIBIT B <br />Special Conditions <br />1. The operator shall ensure that a sample survey for cultural resources is <br />performed on all areas where there is the potential for subsidence. <br />Emphasis should be directed towards the determination of the presence or <br />abseace of sites which may be sensitive to the adverse effects of <br />subsidence, e.g., historic and prehistoric structures andlor structural <br />remaias, rock shelters, and rock art site. If such resources are located, <br />further surveys may be necessary. <br />2. Should sites which may be sensitive to subsidence be located, the operator <br />shall consult with the Colorado HLRD and OSMRE to determine whether <br />mitigation measures or monitoring activities are necessary to either avoid <br />adverse impacts or to determine whether the site will be impacted by <br />subsidence. <br />c <br /> <br />~. <br />