Laserfiche WebLink
Walker to Berry <br />March 30, 1999 <br />Page 5 of 5 pages <br />erosional feature, place road crossings, stabilize head erosion, fitrrow ditch slopes, plant trees. <br />8. 5 @ $10,444 = $52,000 <br />9. I /2 dozer day a $250. Riprap and textile @ $21,000 - $2 I ,250 <br />10. 2 (a~ $3000 = $6000 <br />I I . '/i dozer day @ $250, Riprap and textile @ $31,000 = $31.250 <br />12. 2 dozer days = I ,000 <br />13. est 20 acres, 100 seedlings/acre @ $0.28 each = $20,000 <br />total = $131,500 <br />Cost savings: Perhaps non-combustible demolition wastes (concrete, asphalt, etc.) would be <br />available for a lot of the riprap (an alternative to landfill of such materials). A layer of rock <br />could be placed over the waste to improve aesthetics. <br />Cc: Larry Routten, Jim Stark, Harry Ranney, Jim McArdle, and John Nelson <br />