My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56300
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:11 PM
Creation date
11/23/2007 11:19:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
3/30/1999
Doc Name
MEMO INSPECTION REPORT OF EROSION AT GEC
From
DMG
To
DAN HERNANDEZ
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walker to Berry <br />March 30, 1999 <br />Page 5 of 5 pages <br />erosional feature, place road crossings, stabilize head erosion, fitrrow ditch slopes, plant trees. <br />8. 5 @ $10,444 = $52,000 <br />9. I /2 dozer day a $250. Riprap and textile @ $21,000 - $2 I ,250 <br />10. 2 (a~ $3000 = $6000 <br />I I . '/i dozer day @ $250, Riprap and textile @ $31,000 = $31.250 <br />12. 2 dozer days = I ,000 <br />13. est 20 acres, 100 seedlings/acre @ $0.28 each = $20,000 <br />total = $131,500 <br />Cost savings: Perhaps non-combustible demolition wastes (concrete, asphalt, etc.) would be <br />available for a lot of the riprap (an alternative to landfill of such materials). A layer of rock <br />could be placed over the waste to improve aesthetics. <br />Cc: Larry Routten, Jim Stark, Harry Ranney, Jim McArdle, and John Nelson <br />
The URL can be used to link to this page
Your browser does not support the video tag.