My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56196
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:06 PM
Creation date
11/23/2007 11:14:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
2/10/1984
Doc Name
FINAL RECLAIMED CONFIGURATION RESPONSE ORCHARD VALLEY MINE C-038-83
From
MLRD
To
COLO WESTMORELAND INC
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"As a portion of the phase II submittal, in September of 1983, Geo-Hydro <br />observed that several "sophisticated inclinometers stability monitoring <br />devices" had been installed within the surface facility area. The <br />purpose of these monitoring devices was to verify observations and <br />pro,~ectlons made by the consultant regarding the stability of the ma,~or <br />embankment fills within the surface facility area at the mine. The <br />applicant requested and received an extension of the originally <br />stipulated submittal deadline for phase fII's report, partially <br />justified by the need to accumulate inclinometer data for the period of <br />at least one year. However, no mention is made of this important data <br />within the phase III submittal. The applicant's consultant should amend <br />the submittal to Include discussion of the inclinometer monitoring <br />results." <br />This report satisfies the request for presentation of the Inclinometer data. <br />However, based upon the observed movement within several of the fills at the <br />Orchard Valley Mine site, we recommend that Colorado Westmoreland Inc. <br />continue periodic monitoring of those inclinometer and piezometer <br />Installations. The monitoring should be monthly or as Geo-Hydro recommends. <br />CWI should respond with a statement of the frequency of monitoring to be <br />done. Upon a response by CWI, the Division will consider this matter resolved. <br />Sincerely, <br />~,, <br />~,-- -'.. <br />i/ ~~ yC ;-~ ,L <br />~~ _ ~ ~-__ <br />Robert Llddle <br />Reclamation Specialist <br />RL/ep <br />cc: Jim Pendleton <br />Doc. No. 9350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.