Laserfiche WebLink
*, , 'v <br />III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resuurces <br />~ r, <br />1313 Shermsr. St.. Room 215 <br />Denver, CO 80203 <br />Nhone: (3031 866-3567 <br />Fnx:ao31s3z-slob MINING PERMIT - COAL FEB16199~ <br />L~ r <br />Permit Date July 19, 1992 Permit No. C-81-033 M1NEFr.4~~~ <br />Permit Expiration Date July 19, 1997 <br />4~ pF C'p~p'p <br />N~ <br />•~~R. <br />~ I876 <br />Roy Romer <br />Governor <br />Michael B. Long <br />Urvision UlreelOr <br />THIS PERMIT is issued by the Division of Minerals and Geology, Department of <br />Natural Resources, State of Colorado. <br />RECITALS <br />I. Bear Coal Co Inc ("operator") desires to conduct a mining operation <br />known as Bear Mine for the purpose of extracting coal. <br />II. On January 22, 1993, the Division of Minerals and Geology ("the <br />Division") approved the operator's application for this permit, and backdated' <br />the permit to July 19, 1992 to preserve legal continuity of consecutive five <br />year terms. The bond amount is fixed, and the Division has directed that this <br />permit be issued upon the filing with the Division of bond in the amount so <br />fixed in form and substance approved by the Division, and such bond has been <br />so furnished. <br />III. On November 20, 1992, the Division made the following findings: <br />(a) The permit application is accurate and contains all information <br />required under C.R.S., 34-33-101 et sec. and regulations promulgated <br />thereunder and that all the requirements of Article 33 of Title 34, C.R.S. <br />("such article") for the issue of a permit have been complied with; <br />(b> The applicant has demonstrated that reclamation as required by such <br />article can be accomplished under the reclamation plan contained in the permit <br />application; <br />(c) The assessment of the probable cumulative impact of all anticipated <br />mining in the area on the hydrologic balance specified in Section <br />34-33-110(2)(1) has been made by the Division and the proposed operation <br />thereof has been designed to prevent material damage to the hydrologic balance <br />outside the permit area; <br />(d) Granting the permit will not conflict with any designation decision <br />issued pursuant to Section 522 of the Federal "Surface Mining Control and <br />Reclamation Act of 1977", as amended, (P.L. 95-87), nor is the area proposed <br />to be mined within an area under study for unsuitability designation in an <br />administrative proceeding commenced pursuant to Section 34-33-126 or <br />Section 522 of said P.L. 95-87. <br />