Laserfiche WebLink
Mr. David Beverlin - 4 - January 30, 1990 <br />G. Coordinates were obtained from Exhibit 4.6-3 for the sedimentation <br />pond. These were drafted onto Exhibit 1.0-1, This outline was <br />then traced onto Exhibits 3.5-1, 3.5-22, 4.6-1, 4.6-2 and 4.6-D1. <br />Exhibit 3.5-1 shows the utility road going through the <br />sedimentation pond. The sedimentation pond is improperly depicted <br />on the others. Please correct these exhibits. <br />16. The use of the term "utility road" is not defined in your commentary. <br />Please indicate if this is an access or light use road and specify the <br />parameters which were used in its design in accordance with Rule 4.03, <br />Estimated reclamation costs for mining in the Moffat area are being reviewed. <br />In addition, the Division is in the process of calculating reclamation costs <br />for bonding purposes. The results of this review and calculation and any <br />additional adequacy questions will be forwarded to you as soon as possible. <br />In order for the Division to make its findings within the reouired time frame <br />it is requested that your response be received on or before March 29, 1990. <br />If you have any questions, Dlease contact Ms. Susan Mowry or me. <br />Sincerely, <br />~~-~ <br />J. M. Clayton <br />Reclamation Speciali <br />J M(: /e rn <br />3474E <br />