My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56161
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:05 PM
Creation date
11/23/2007 11:10:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1987072
IBM Index Class Name
General Documents
Doc Date
2/26/1990
Doc Name
LA PLATA LETTER OF AGREEMENT FILE C-87-072
From
MLRD
To
FIRST NATIONAL BANK OF FLORENCE
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.. <br />-2- <br />C. Backfilling and grading of the portal bench, the guard trailer <br />bench and the affected drainage segment between the upper bench and <br />the lower facilities area will be conducted in compliance with the <br />approved plan contained in permit C-87-072 and as further detailed <br />in a letter dated February 5, 1990 from Mr. Dan Mathews, of the <br />Division to Mr. W,D. Lamoreux, of the Bank (Attachment 21. Unless <br />an acceptable alternative plan is submitted by the Bank and <br />approved by the Division, portal and trailer bench backfill <br />material will be spread in 24 inch lifts and compacted to 90~ of <br />maximum dry density. The steep sided drainage segment extending up <br />from the lower or facilities bench to the base of the backfilled <br />portal bench will be graded to a uniform gradient, with abrupt <br />slope transitions and pads associated with conveyor supports <br />eliminated. Backfilling and grading of the portal bench, guard <br />trailer bench and drainage segment will be initiated no later than <br />July 1, 1990 and completed no later than September 1, 1990. <br />D. Backfilling of portal access and light use roads, top soiling of the <br />lower bench, backfiTling of acid treatment ponds, Teach pads and <br />septic tank excavation, sealing of three drill holes and <br />re vegetation of the entire disturbed area will be conducted in <br />compliance with the approved plan contained in permit C-87-072 and <br />further details specified in the previously referenced <br />December 1, 1989 letter (Attachment 1) and a letter of <br />December 15, 1989 from Mr. Dan Mathews of the Division to <br />Mr, W.D. Lamoreux of the Bank (Attachment 3). These activities <br />will be initiated no later than September 15, 1990 and completed no <br />later than October 15, 1990, <br />E. The existing sediment pond on Mr. Tony Sarver's property to the <br />south of County Road 120 will be reclaimed in compliance with the <br />approved reclamation plan contained in permit C-87-072 no later <br />than October 15, 1990. The bank will submit to the Division no <br />later an une 90 an acceptable alternative sediment control <br />plan add ressin-' a~Fie o ation and design of sediment check dams, <br />berms, ditches and other structures to be installed north of the <br />county road. `The alternative sediment control plan will be <br />implemented by the Bank prior to removal of the existing sediment <br />pond. <br />F. Upon successful completion of the reclamation plan in compliance <br />with this Letter of Agreement, the Bank will be eligible to seek <br />bond release in conformance with the requirements of Rule 3.03. <br />The Bank will be responsible for performing necessary maintenance <br />and repairs at the site during the bond liability period. <br />G. Reclamation tasks and timetables specified in this Letter of <br />Agreement will be strictly adhered to unless specific revisions <br />are requested, in writing, by the Bank and approved, in writing, by <br />the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.