My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56130
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:03 PM
Creation date
11/23/2007 11:09:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/26/1991
Doc Name
INVITATION AND BID-East Mine reveg project
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Hawk's Nest mining operation is comprised of four separate disturbed <br />areas: 1) East Mine; 2) West Mine; 3) Silo Area; and 4) Refuse Disposal Area. <br />Revegetation work to be accomplished under this contract is limited to the <br />East Mine. Facilities demolition and earthwork were completed at this site in <br />the summer of 1991 under Bid No. RN-GOAL-MINES-4. Project work will involve <br />seedbed preparation, seeding, fertilizing, mulching, installation of erosion <br />control blankets, and installation of a hay bale drainage control system. <br />Adequate rights-of-way needed for access to the project area and within the <br />working area limits specified for this project have been acquired by or on <br />behalf of the OWNER. <br />The East Mine area is located within the E1/2 of Section 11, T135, R90W. <br />III. Pro.iect Work Specifications <br />1.0 Mobilization/Demobilization <br />1.1 Description <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired specifically <br />for the construction of this project, including premiums for <br />performance and payment bonds; <br />b. Movement of personnel, equipment, operation supplies, and <br />incidentals to the project site, but not within the work limit area; <br />c. Preparatory work at the construction site; <br />d. Demobilization of CONTRACTOR'S equipment and all other facilities, <br />final project clean-up, and for all other work for which payment is <br />not otherwise provided for under the contract. <br />The temporary works and construction plant may include, but not be limited to <br />the following: <br />a. Workshops, offices, storage yards, and construction plant and <br />equipment including spare parts, fuels, and oil; <br />b. Sanitation facilities, communication facilities, and sprinkler <br />trucks; <br />c. CONTRACTOR'S electrical power system; <br />d. Other items such as water, compressed air, etc., not specifically <br />listed but required for the functioning of construction activities. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.