Laserfiche WebLink
<br />P1emo rand um <br />March 20, 1981 <br />Page Four <br />29. Staff consulted with the staff geotechnical specialist and surface <br />hydrologist as well as the U. S. Army Corps of Engineers, the Water <br />Conservation Board and the Division of Water Resources. An on-site <br />inspection of said mining operation was made by the Director, and <br />numerous meetings by the staff occurred with all concerned parties. <br />The staff's best effort was put into the application which should result in <br />good reclamation and return of stability to all affected lands. <br />