My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56094
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:01 PM
Creation date
11/23/2007 11:07:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
4/17/1984
Doc Name
STIPULATION AND COMITMENTS TO N THOMPSON CREEK MINE PN C-025-81
From
MLRD
To
SNOWMASS COAL CO
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T ^ <br /> <br />Mr. Scott Jones <br />-3- April 17, 1984 <br />One final item, there is almost no more room in the existing Snowmass <br />application to incorporate additions and revisions. We are therefore <br />requesting that Snowmass provide three additional binders labelled Volume VI <br />that would allow us to incorporate all new revisions, inflow studies, <br />augmentation plans etc. You should devise a simple table of contents and <br />provide appropriate plastic slip covers for maps. This will enable your <br />application to remain clear and concise as required under Rule 2.03.3, and <br />will enable efficient public review of the entire mine plan. Future <br />submittals should be submitted in a form that enables incorporation in this <br />volume. <br />In summary: <br />1) Stipulation No. 1 is resolved. <br />2) The subsidence format is acceptable provided subsidence maps are <br />provided. <br />3) The inflow study should be done in June (starting 1984). <br />4) The annual report should be completed by January and cover water <br />year October to September. (1st report due January 1, 1985.) <br />5) Mine discharge and consumption needs to be provided with future <br />inflow studies. <br />6) As built designs are acceptable. <br />1) Well depths should be reported as elevations. <br />8) The plan for controlling Canadian Thistle at the mine is acceptable. <br />9) Snowmass should report the status of the Augmentation plan by <br />May 15, 1984. <br />10) An additional volume for the application should be provided. <br />Please respond on whether you agree to the conditions listed in 2, 3, 4, 5, 7, <br />and 10 above. If you have any questions please contact me. Finally, I'm <br />sorry our review took so long, we appreciate your patience. <br />~~,~: z <br />Robert G. Liddle <br />Reclamation Specialist <br />RGL/tlh <br />Doc. No. 0817 <br />
The URL can be used to link to this page
Your browser does not support the video tag.