Laserfiche WebLink
C. Project Description. Descrrl~e alt aspects of the operation including mining milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, <br />power requirements, how clearing will be accomplished, topsoil stockpile, waste rock <br />Placement, tailings disposal, Proposed number of dell holes and depth, depth of Proposed <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. <br />lnolude justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. <br />used for some reclamation and re-contouring of excavation and prospect sites. <br />(Ijmore space is needed to fi/! out a block ojfnjormation, use adduionaf sheets and attach to jorm.) <br />all c~stals are carefullycollected by tmnd wraPpgd is paper. aad transported &orn site. <br />c~sidered part of this operations plan. <br />