My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56002
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:56 PM
Creation date
11/23/2007 11:01:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/11/1996
Doc Name
PROCEDURES AND MATERIALS FOR 1996 CONSTRUCTION DRAIN COVER THICKNESS ON ROADS USED BY CONTRACTORS HA
From
DNR
To
BERHAN KEFFELEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to Berhan Keffelew <br />CRESSON Haul Road Thickness <br />page 4 <br />If the above conditions are adhered to I believe the liner will be protected <br />from adverse impacts due to the operation of loaded side-dump haul <br />trucks. Within areas of restricted truck routing, such as the saturated <br />pond and the narrow portions of the lower Phase II valley, I encourage <br />CC&VG to consider placement of the originally specified five foot haul <br />road section thickness. Realistically, the early 10 foot thick ore haulage <br />ramps will follow the same alinement. Immediately following the <br />completion of construction these thickened road ramps will be subjected <br />to pregnant fluids, which will minimize the inventorying of ore in haul <br />road ramps. <br />cc: Mike Long <br />Bruce Humphries <br />Jim Stevens <br />Jim Dillie <br />Allen Sorenson <br />Doc: M:\MIN\JAP\CRESSON\ROADFILL.APR <br />JP/JP <br />
The URL can be used to link to this page
Your browser does not support the video tag.