My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55996
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:56 PM
Creation date
11/23/2007 11:01:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
12/30/2003
Doc Name
Proposed Decision & Findings of Compliance for RN4
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Division of Minerals and Geology proposes to approve with one stipulation an <br />application for renewal of a valid existing permit. <br />The application was submitted by Bowie Resources Limited for the Bowie No. 1 Mine. This <br />decision is based on a finding that the operations will comply with all requirements of the <br />Colorado State Program as found in the Colorado Surface Coal Mining Reclamation Act, C.R.S. <br />34-33-101 et seq., and the Regulations promulgated pursuant to the Act. If no request for a <br />formal hearing is made within thirty (30) days of the first publication of the issuance of this <br />proposed decision, then this decision becomes final. Upon submittal of acceptable surety by the <br />applicant, the permit will be issued. The permit application, all supporting documentation and <br />any stipulations or conditions will become a binding part of the permit. The following aze the <br />stipulations which are still active. Stipulation No. 54 was modified specifically for this permit <br />renewal. The other stipulations came from previous permitting actions. All other stipulations <br />have been complied with or have been terminated. <br />Stipulation No. 26 <br />One year after the completion of reclamation activities at the loadout, the operator shall <br />compaze the soil characteristics ofthe reclaimed azea with the adjacent undisturbed orchard <br />areas to verify that the hydrologic function of flood irrigability has been restored. Such <br />comparison should be in the form of infiltration, permeability and texture studies. <br />Stipulation No. 34 <br />Minimization of wildlife disturbance on the light use road which runs between the Bowie <br />No. 1 West Mine and the ventilation shaft/water storage tank bench will be accomplished by: <br />a. Closing road to public use; <br />b. Limiting travel for routine maintenance activities to between 10 a.m. and 2 p.m. <br />during December, January, March and April when big game animals are present. <br />Stipulation No. 53 <br />Before mining resumes, BRL will submit, and obtain Division approval for, a <br />revision that addresses the planned mining sequence for the remainder of the existing <br />permit term. <br />
The URL can be used to link to this page
Your browser does not support the video tag.