Laserfiche WebLink
iii iiuiiiiiiiu iii <br />6/23/98 <br />To: File No. C-81-026, Canadian Strip Mine <br />Fmm: Sandy Brown <br />RE: 1998 Vegetation Sampling <br />I reviewed the sampling plan submitted by Greystone for the 1998 Vegetation sampling at the <br />Canadian Strip Mine. Overall, the sampling plan is the same as last year with one exception. They <br />have proposed collecting production data in a 0.5m2 plot instead of the 1 m2 plot they used last year. I <br />talked to Jerry Koblitz today and he said they would use the same size this year as last year, 1m2. <br />W ith that change the plan is fine. Sampling is tentatively scheduled for the third or fourth week of July. <br />Jerry said he would be on site tomorrow to spray any weeds that need to be eradicated. I will meet him <br />on site when I do my regular partial inspection. <br />I talked to Jim Perry from BLM yesterday. He was asking about the reinstallation of the BLM fences <br />that were agreed to a couple of years ago. Jerry Koblitz said they would build the fences once all the <br />vegetation sampling is complete and found to be adequate, probably later this summer or fall. <br />SLBrown <br />