Laserfiche WebLink
5. Rule 3.03.1(2)(b) Prime Farmlands, Alluvial Valley Floors, Croplands <br />.................................................18 <br />6. Rule 3.03.1(3)(b) Suspended Solids ........................ 18 <br />7. Rule 3.03.1(3)(b) Productivity and Hydrologic Functions ......... 19 <br />8. Rule 3.03.1(3)(c) Maintenance of Permanent Impoundments ....... 19 <br />9. Summary and Conclusions .............................. 20 <br />D. Evaluation by the Division -Phase III ........................... 20 <br />1. Rule 3.03.1(2)(c) Release of Remaining Bond ................. 20 <br />2. Rule 3.03.1(3)(a) Reestablishment of Revegetation .............. 21 <br />3. Rule 3.03.1(3)(d) Minimum Retention -Remaining Reclamation Work <br /> ................................................. 22 <br />4. Rule 3.03.1(3)(e) Release of Forfeiture Bond .................. 22 <br />5. Rule 3.03.1(4) Minimum Retention - $10,000 Minimum .......... 23 <br />6. Rule 3.03.1(5) Temporary Drainage and Sediment Structures ...... 23 <br />7. Rule 3.03.2(2) Difficulty to Complete Reclamation .............. 24 <br />8. Rule 3.03.2(2) Pollution of Surface Water .................... 24 <br />9. Rule 3.03.2(2) Pollution of Ground Water ................... 25 <br />10. Rule 3.03.2(2) Cost of Pollution Abatement .................. 26 <br />11. Rule 3.03.2(2) Probability of Future Pollution ................. 26 <br />12. Rules 4.05.13(1)(d)(ii), 4.05.13(3)(a), and 4.07 Removal of Monitoring <br /> Equipment ......................................... 27 <br />13. Rule 4.15.8 Success Standards for Cover .................... 27 <br />14. Rule 4.15.9 Revegetation Criteria, Cropland .................. 27 <br />15. Rule 4.20.3(1) Surface Owner Protection (Subsidence) ........... 28 <br />16. Resolution of Comments and Other Reclamation Requirements ..... 29 <br />17. Summary and Conclusions .............................. 30 <br />IV. PROPOSED DECISION .........................................30 <br />3 20 January 1998 <br />