Laserfiche WebLink
. -_ <br />RCU bY: xEkux TELECGPIER 70 i'Z 5-2~-95 4: uQiPM <br />Mgr 23 •94 0d:53PM DIVif'II~RHL.,BG~OLOGY <br /> <br />. <br />~. Please provide the <br />material pas cubic <br />minimum o! 538 ny o! <br />design. Please ino <br />needea (97B cy) as <br />per cubio ynrfl. <br />Keealer'a Reolamat <br />additional rip-rap. <br />rip-rap cost has Cha; <br />D <br />r <br />In <br />will be used for add <br />will be used ss a <br />direction of the Dro- <br />3i'~3 832 8:06-~ <br />az <br />P. 2~2 <br />.elon with a new cost of rip-rnp <br />The Division estimates that a <br />~-rap is needed for the specified <br />~ a coat for the minimum rip-rap <br />. as n line item ooet of rip-rap <br />the original bid submitted by <br />S20/Cy was the piioe for <br />ease notify the Division if this <br />,. Any additional !undo remaining <br />.onal rip-rap in the channel, or <br />lotion in Magpie Creek (at the <br />t mannger). <br />S. Please delineate the~remaininq cost for earth work <br />associated with the d ch design (not including magpie <br />creek above, planes do that separately). <br />As I ^tated on the phone, the Dig <br />as possible to determine what mo <br />mado. Energy Fuels and Dr. Cor <br />figures are reviewed by the Divi <br />mentioned above as woll as the <br />appreoiats an Smmediete response <br />details with EFCI and Dr. Corley <br />i! you have any guestiona or <br />call. <br />Sincerely, <br />GAS <br />Ericn S. Croaby~~~~~ <br />Project KanaQer <br />ce: Larry Routten <br />David Berry <br />m:\coal\ese\Qee\940530 <br />le ion needs these tiquras ns soon <br />IitiCations to the design must bo <br />.ey will be consulted once these <br />.ion. Please line item each teak <br />otnl cost for the job. I would <br />to this letter so the remaining <br />can be resolved. <br />please do not hesitate to <br />. .. ..rcHl.:v YV,S': t:.. ~ .. L~. ~ <br />