Laserfiche WebLink
f <br />.cit lplllaL101] IdO. 17 <br />• YJITHIN 60 DAYS OF PERIdIT ISSUANCE THE PERAil'fTEE ASUST EITHER <br />REVISE THE RECLAMATION PLAN TO INCLUDE REA70VAL AIdD RECLAMATION <br />OF THE NORTHERN 1J0. 1 HAUL ROAD AND THE L•JILS01~-LOUDY LOADOUT <br />HAUL ROAD OR SUBMIT THE INFORMATION REQUIRED BY RULE 2.05.5 <br />FOR POST-MII1IPdG LAND USE CHANGE. <br />Idorthern Coal's Answer: <br />The information requirc~J t.o keep the Wilson-Luudy Haul Road <br />in place after reclamat_cn 1•:as submitted to the division on <br />August 2, 1984. A cor.,,~ f' tl]at information is included here <br />for reference. <br />The surface owner for ti;~• :'orthern No. 1 Aline has also <br />requested that the haul :•c:::i be left in place for that mine. <br />A copy of that letter is ^lso included. <br />• <br /> <br />