My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55820
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:47 PM
Creation date
11/23/2007 10:50:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
General Documents
Doc Name
STIPULATION 3
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />~ 1 <br />SLOPE STRRILITY MONITORING PLAN ~^ ~`~nn~ <br />~.i .! c~ I~~.:, <br /> <br />In order to monitor the stability of reclaimed slopes monuments will be <br />placed and monitored according to the following plan. <br />The monuments will be constructed as shown in Figure 1. Each monument <br />will consist of a smooth metal pin 1 to 1 1/2 inches in diameter and 7 <br />feet in length. The pin is to be buried in the ground to a depth of 7 <br />feet. If rocK is encountered at a depth of less than 7 feet the rocK <br />1s to be drilled for a depth of not less than 1 foot and the pin resin <br />grouted into the rocK. R plastic pipe 2 to 2 1/2 inches in diameter <br />and 6 feet in length is placed around the pin uith the top of the pipe <br />flush with the top of the pin. The void between the pin and the pipe <br />is filled with dry sand or soil. A cap to Keep out moisture is Placed <br />over the pipe. The monument can be placed flush with the ground, <br />counter sunk or placed as shown in Figure 1 depending on the amount and <br />type of traffic in the area. In all cases the monuments are to be <br />staKed and well flagged. <br />The monuments are to be placed in sets of two as shown in Figure 2. <br />The first monument of each set is to be placed in the rim or top of the <br />slope fill area. The second monument in each set is placed in the toe <br />or bottom of the slope fill area. The exact placement will be <br />determined by the supervising engineer at the time of reclamation. <br />These monument sets are to be placed along the slope fill on 7~r to1QQ <br />feet centers. Rga1n the exact placement will be determined by the <br />supervising engineer at the time of reclamation. <br />;LOPE MONITORING <br />A surrey of the monuments is to 6e performed annually to detect <br />horizontal ar~d/or vertical movement. This survey is to be certified by <br />either a registered ]and surveyor or professional engineer. In <br />addition to the survey the reclaimed slopes are to be inspected <br />annually by a professional engineer and certified as to the stability <br />of the slopes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.