Laserfiche WebLink
Ub~:h•95 17:U~ ~1 908 985 :UBU bULLER-C.t,S <br />June 28, 1995 • -2- ~ 953-?900.007 <br />Therefore, the modifications were based on the site specific conditions that were <br />encountered, and the optimum utilization of the existing excavations and materials that <br />were available. <br />Golder appreciates the ongoing opportunity to provide technical suppon for the Cresson <br />Project. Please contact the undetsi~ed if you should have any questions or ectnmenu. <br />Sincerely, <br />GOLDER ASSOCL~,TES L1TC. <br />/ ~~~ - / <br />/,~.~ Du~c van Zy1,Ph_ D <br />Strategic Director Ivlinin; <br />J L ` <br />Tery Mandziak <br />Project Engineer <br />DVZ/IM/DLO/tm <br />a9ooeezs.ia <br />ce: Mr. Tim Kotnadina, CC&V <br />Mr. .Ron Roberts, FF3dcD <br />Mr. David Di.~c. Golder <br />~ooa <br />Golder Associates Inc. <br />