Laserfiche WebLink
TABLE 1 <br />EDNA b1INE <br />SUMMARY OF ESTIi\fATED LIABILITY COSTS 1992-1996 <br />R lama ion .a ~*orv <br />1'F 1'EAg? YF,AB~. ~ESB~ 1'F4B,~ <br />1. Regrading of Final Pits $937,210 $430,014 $358,667 $391,423 $413,475 <br />2. Rough Grading aF Spoil Areas $221,500 $16,077 $14,290 $14,290 $16,077 <br />3. Facility/Road/Stockpile Gradi ng $175,069 $167,954 $168,971 $169,989 $171,007 <br />4. Final Grading $31,401 $22,245 $20,883 $20,888 $21,227 <br />5. Topsoil Replacement $692,204 $505,710 $-171,183 $471,153 $479,815 <br />6. Revegetation $534,1376 $-189,389 $44'1,983 $439,526 $-146,876 <br />7. Sediment Pond Removal $165,801 $165,801 $165,801 $165,801 $165,501 <br />8. Facility Removal $864,595 $864,595 $864,595 $864,595 $864,595 <br />9. Powerline Removal $14,879 $14,879 $14,879 $14,879 $14,879 <br />10. W. Ridge Hydrologic Const. $372.565 $298.052 , 22 4 2 $74.513 <br />SUBTOTAL $4,009,361 $2,974,716 $2,782,636 $2,701,600 $2,668,265 <br />Cont i~encies. Prof. Services. M~mt. Costs <br />A. Mobilization & Demobilization <br /> (lOr/o of Items 1-10) $400,936 $297,472 <br />B. Contingencies <br /> (10%a of Items 1-10) $400,936 $297,472 <br />C. Hard Costs <br /> (Summation of Items 1-10, A, B) $4,811,233 $3,569,659 <br />D. Engineering Costs <br /> (10% of Item C) $481,123 $356,966 <br />E. Reclamation Ivlgmt. & Admin. <br /> (5.10 of Item C) $245,373 $182,053 <br />F. Profit & Overhead <br /> (18.5% of Item C) $890,078 $660,387 <br />TOTAL LIABILITY ESTIMATE FOR BONDING PURPOSES <br />$278,264 <br />$278,264 <br />$3,339,164 <br />$333,916 <br />$170,297 <br />$617,745 <br />$270,160 <br />$270,160 <br />$3,241,920 <br />$324,192 <br />$165,338 <br />$599,755 <br />$266,827 <br />$266,827 <br />$3,201,918 <br />$320,192 <br />$163,298 <br />$592,355 <br />(Summation of Items C-F) $6,427,808 $4,769,065 $4,461,122 $4,331,205 $4,277,762 <br />III. DETERMINATION OF RECLAMATION COST PER YEAR <br />As shown in Table 1 for each of the five years in the 1992-1996 permit term, the estimated liability <br />bond amount is based upon the costs resulting from 10 categories of required reclamation (rows 1- <br />2 <br />December 12, 1991 <br />