My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55746
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:43 PM
Creation date
11/23/2007 10:44:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
10/27/1998
Doc Name
NEED FOR STATE RECLAMATION PERMIT
From
DMG
To
ENERGY FUELS MINING CO
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />8. To what approximate depth will [he extraction extend? <br />9. In cubic yards, approximately how much material will be removed? <br />10. By what method(s) will the material be extracted? <br />11. Will either the landowner or the mine site operator receive any type of compensation, i.e., monetary, in-kind, <br />etc., from the proposed material extraction? <br />12. Please supply a copy of any documents that will ensure that the area of extraction will be reclaimed [o some <br />benet"icial land use once extraction activities have been completed. <br />l3. Do you have permits for this activity from any other governmental agencies, and, if so, what are they? <br />14. Ate there state/federal/local agencies participants in terms of funding (yes}(no), design (yes}(no): What are <br />the percentages? <br />We [cast that the activities will be performed as represented. If we receive a complaint, we are required to conduct <br />an inspection of the site. <br />Send the petition to the Division, and we will make a determination or schedule the petition before the Board at its <br />next meeting. Normally, the Board meets each month in Denver for two days. The meetings are held in Room 318, <br />1313 Sherman Sveet, starting at 9:00 a.m. The next monthly meeting of the Board is November 18 - 19, 1998. <br />ff there is a hearing.on this matter, we recommend that you or your representative be present at the meeting when your <br />petition is considered. You are encouraged to make your own presentation and answer questions by the Board. The <br />Division will not make your arguments for you. We will, however, schedule consideration of your petition by the <br />Board. <br />if we schedule this matter for a Declaratory Order hearing, you should prepare l0 copies of the material you wish to <br />present to the Board. We need to receive your material 10 days prior to the scheduled Board hearing date, so that <br />we have time [o distribute your copes to [he Board for their use during [he meeting. <br />During the hearing, the Division may recommend to the Board that you need a permit. That recommendation will <br />be based on the petition's content and conversations with you in its regard. The Division's recommendations, <br />however, are not always followed. The Board will make the final decision on this matter. <br />Sincerel <br />Petrina M. Morgan <br />Administrative Assistant <br />Enclosure / <br />cc: Ken[ Gorham, DMG <br />Dan Hernandez, DMG <br />M ~OSS\PMh7U1M\W EAV ER D1H <br />
The URL can be used to link to this page
Your browser does not support the video tag.