Rider to Mining Permit No. C-81-020 <br />April 10, 1993 <br />Page 2 <br />Stipulation No. 12 <br />THE PERMITTEE SHALL MAINTAIN RAPTOR BUFFER ZONES ESTABLISHED FOR THE <br />MUNGER CANYON MINE BY THE USFWS FOLLOWING COMPLETION OF THE INITIAL <br />RAPTOR SURVEY CONDUCTED IN JULY 1983. NO SURFACE DISTURBANCES SHALL <br />OCCUR WITHIN ESTABLISHED BUFFER ZONES EXCEPT AS SPECIFICALLY AUTHORIZED <br />BY CMLRD IN CONSULTATION WITH THE USFWS AND CDOW. <br />Stipulation No. 14 <br />THE DIVISION REQUIRES SALT CREEK MINING TO COMPLETE APPROPRIATE WASTE <br />SHEAR STRENGTH TESTS AND TO SUBMIT THE RESULTS OF THOSE 7EST5 TO THE <br />DIVISION FOR REVIEW AND APPROVAL, IMMEDIATELY FOLLOWING THE <br />AVAILABILITY OF REPRESENTATIVE COAL PROCESSING WASTE REFUSE MATERIALS. <br />IF SIGNIFICANT MATERIAL STRENGTH VARIATION OCCURS BETWEEN THE ACTUAL <br />TEST RESULTS AND THOSE VALUES ASSUMED IN COMPLETING THE STABILITY <br />ANALYSIS INCLUDED WITHIN THE AMENDED PERMIT REVISION APPLICATION, THE <br />DIVISION WILL REQUIRE SALT CREEK MINING TO COMPLETE AMENDED STABILITY <br />ANALYSIS AND DESIGN REVISION TO THE WASTE PILE PLAN. <br />Stipulation No. 15 <br />THE DIVISION DIRECTS SALT CREEK MINING COMPANY TO INSTALL SIGNS AT THE <br />PERMIT BOUNDARY AND AT STATION 67+00' ADJOINING THE HAUL ROAD. THESE <br />SIGNS, LEGIBLE FROM THE HAUL ROAD WHILE PROCEEDING TOWARDTHE PORTAL <br />BENCH, SHALL READ: "ROAD SLOPES SUBJECT TO ROCKFALL AND SLOPE FAILURE <br />PROCEED WITH CARE." <br />Stipulation No. 16 <br />PRIOR TO CONSTRUCTION OF THE HAUL ROAD, THE APPLICANT MUST PROPOSE <br />THE INSTALLATION OF ADDITIONAL ROAD SURFACE DRAINAGE CULVERTS TO <br />MEET THE SPACING REQUIREMENTS OF RULE 4.03.1(4)(e)(vi)(A). <br />ALTERNATIVE SPECIFICATIONS MAY BE UTILIZED UNDER THE PROVISIONS IN <br />RULE 4.03.1(4)(e)(vi) IF THE APPLICANT DEMONSTRATES THAT THESE <br />SPECIFICATIONS WILL NOT RESULT IN AN INCREASE IN EROSION. <br />Stipulation No. 17 <br />A PERFORMANCE BOND IN THE AMOUNT OF $691,804.00, PAYABLE TO THE STATE <br />OF COLORADO AND THE OFFICE OF SURFACE MINING, MUST BE FILED WITH THE <br />DIVISION NO LATER THAN 60 DAYS PRIOR TO INITIATING ANY DISTURBANCE <br />ASSOCIATED WITH THE PERMIT REVISION N0. 1 (CENTRAL FACILITIES) <br />APPROVAL. NO DISTURBANCE SHALL OCCUR UNTIL THE PERFORMANCE BOND HAS <br />BEEN APPROVED AND ACCEPTED BY THE DIVISION. <br />