My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55643
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:38 PM
Creation date
11/23/2007 10:39:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
2/8/1995
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ... <br />~ _ <br />r <br />c <br />... <br />r `:~ ~. <br />r.i <br />~. _ <br />~ ..'~ r <br />T J ... .. .. ..'v.. ..- - .... ~a..-~..... -...rM .. ~i:. ~vJ.. <br />previously required permit stipulations can be found within the Division files. All <br />stipulations not listed below have been previously satisfied. <br />Stioulation No. 6 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION AN ANNUAL HYDROLOGIC REPORT. <br />THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL HYDROLOGIC DATA GATHERED <br />DURING THE YEAR, AN ASSESSMENT OF THE HYDROLOGIC IlvfPACTS OF MEVING DURING <br />THE YEAR, AND AN ASSESSMENT OF THE PROTECTED HYDROLOGIC IMPACTS OF MINING <br />IN THH FOLLOWING YEAR. THIS REPORT SHALL ASSESS THB IMPACTS OF MINING ON <br />THE QUALITY AND QUANTITY OF WATER IN SURFACE STREAMS, SPRINGS, GROUND <br />WATER AQUIFERS, MINE INFLAW, AND MINE DISCHARGES. <br />Stipulation No. 21 <br />BEAR COAL COMPANY SHALL MONITOR BOTH THH OPERATIONAL AND RECLABorED <br />CONFIGURATTONS OF THE PORTAL ASSESS ROAD AND PORTAL FACII.ITIPS OF THB NO. 3 <br />MINE. MONITORING SHALL CONTINUE ON ASEMI-ANNUAL BASIS UNTIL TWO YEARS <br />FOLLOWING COMPLETION OF THE RECLAMATION OF THE PORTAL ACCESS ROAD AND <br />PORTAL FACII.TTY AREA. RESULTS OF THE MONITORING SHALL BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS FOLLOWING COMPLETION OF EACH MONITORING EPISODE. <br />Stipulation No. 32 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVLSION AN ANNUAL REPORT OF <br />INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WPI'HIN THE MINE. AMINE <br />WORKINGS MAP, SHOWING THE SOURCE (FAULT, FRACTURE, ETC.), QUANTITY, <br />DURATION AND QUALITY OF INFLAWS, SHALL ONLY BE REQUBtED IF THERE ARE <br />MEASURABLE INFLAWS TO THE MINE DURING THE YEAR. RECORDS OF WATER <br />DISCHARGED FROM, CONSUMED IN, AND BvfPORTED TO THE MINE WII.L ALSO BE <br />INCLUDED. THE ABOVE INI~'ORMATION WE.L BE SUBMITTED REGULARLY WITH THE <br />ANNUAL HYDROLOGY REPORT. <br />Stipulation No. 33 <br />BEAR COAL COMPANY WILT., BEFORE INITIATION OF MINING PERMITTED BY PR-01, <br />SECURE A SIGNED COAL LEASE AGREEMENT WITH ARCO GRANTING BEAR COAL <br />COMPANY THE RIGHT TO MINE COAL IN THE B-SEAM IN THE PJ2 SFJ4 SECTION 1H, <br />T13S, R90W OF THE 6TH P.M. RIGHT OF ENTRY ONTO THE SURFACE OVERLYING THIS <br />AREA MUST ALSO BE OBTAINED. <br />Stipulation No. 34 <br />THE PERMITTEE WILL INSTALL A GROUNDWATER MONITORING. WELL DOWNDII' FROM <br />THE MINE WORKINGS AND IN'CO THE B-SEAM (BETWEEN THE FOURTH NORTH MAINS <br />AND THE NORTH FORK OF THE GUNNISION RIVER) FOR THE PURPOSES OF MONITORING <br />THE POTENTIAL EFFECTS OF MINING ON THE B-SEAM AQUIFER. THE FINAL LOCATION <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.