Laserfiche WebLink
STIPULATION NO. 24 <br />TABLE 3.1-I WILL BE EXPANDED TO ADDRESS THE RECLAIMED <br />CHANNELS IN THE VICIN[TY OF THE RECLAIMED LOWER ACCESS <br />ROAD AND SEDIMENT POND/TOPSOIL STOCKPILE SITE. RIPRAP <br />SIZING, GRADATION, AND INSTALLATION DESIGN DETAILS WILL BE <br />PROVIDED FOR THOSE CHANNEL SEGMENTS WHICH REQUIRE RIPRAP <br />PROTECTION, AND RECLAMATION PLAN TEXT WILL BE AMENDED TO <br />SPECIFY THAT CONCRETE FROM FOUNDATIONS AND OTHER SOURCES <br />WILL BE BURIED AT LEAST FOUR FEET BELOW GRADE, IN LOCATIONS <br />OTHER THAN THE RECLAIMED CHANNELS. THESE AMENDMENTS <br />WILL BE SUBMITTED WITHIN A COMPLETE TECHNICAL REVISION <br />APPLICATION WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />STIPULATION NO. 25 <br />A NARRATIVE DESCRIPTION, LONGITUDINAL PROFILE, AND <br />APPROPRIATE CROSS SECTIONS OF THE TEMPORARY DIVERSION <br />CHANNEL CREATED BY THE ROAD CROSSING OF THE MCCLANE <br />DRAINAGE CHANNEL WILL BE SUBMITTED FOR INCLUSION IN THE <br />APPLICATION, ALONG WITH APPLICABLE FLOW PARAMETERS. <br />SUFFICIENT INFORMATION WILL BE SUBMITTED TO DEMONSTRATE <br />COMPLIANCE WITH THE REQUIREMENTS OF 4.05.3(1), (2), (4), (5), (6), <br />AND (7), and 4.03.1(4)(a)(i). THESE AMENDMENTS WILL BE SUBMITTED <br />WITHIN A COMPLETE TECHNICAL REVISION APPLICATION WITHIN 60 <br />DAYS OF PERMIT ISSUANCE. IF COMPLIANCE WITH THE CITED <br />REQUIREMENTS CANNOT BE DEMONSTRATED, THE REVISION <br />APPLICATION WILL ADDRESS NECESSARY MODIFICATIONS TO THE <br />DIVERSION CHANNEL. <br />The following specific approval is requved by Rule 4. <br />1. Rock riprap lining is proposed for use to control erosion in certain reclaimed <br />ephemeral stream channels. This measure is proposed to be approved by the <br />Division, subject to Stipulation No. 24, since the riprap lining is necessary to <br />control erosion, and the lined channels will be stable and will require infrequent <br />maintenance (4.05.4(2)(a)). <br />16 <br />