Laserfiche WebLink
<br />Colorado Division of Minerals and Geology <br />ESTINATING FOAM - BULLD0IEA NOAk <br />task p: 2 Prep. by: NBR task Ftla Name: 0000-2 <br />Date: 10/29/93 Permit p:C-81-0000 Mine: Gec <br />Permit Action: "MmSt'Slmpm '~ <br />cask Description: put,L<fill 3:1 <br />HOUALY ECUIPMENT COST <br />- ---`-------~_-~- Basic Machine: Cat D10N Horsepower: 520 <br />Blade Type: Universal "``-~ <br />Attachment pl: ROPS Cab Shift Basis: l/day <br />Attachment p2: 3-shank ripper ` ~--"" <br />Cost Breakdown: <br />"""""`"` Utilization i (code hkm) <br />Ownership cost/hr - 568.72 N/A <br />Operating d overhaul cost/hr- doter = 569.38 100 <br />-ripper = 50.00 0 <br />Operator cost/hr = 521.58 N/A <br />Total egpt. unit cost/hr = 5159.67 Total fleet cost/hr: 5319.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 35,000.0 BCY Factor: 1.250 Volume: 43,750.0 LCY <br />Source of quantity takeoff: na <br />Source of est. swell factor: na <br />HOUALY PRODUCTION <br />- -~-~----- -- Job Condition Correction Factors <br />Avg. push distance: 225 ft. <br /> Operator.......... 0.15 avg.) <br />Unadjusted hourly hat. consistency.. 1.00 (Cat tbl) <br />Dozer production: 816 LCY/hr Dozing method..... 1.00 (gen.) <br /> -"~~~~~ ~ Visibility........ 1.00 (avg.) <br />Material consistency : Job efficiency.... 0.83 (lsh/day) <br />Consolidated stockpi le transmission type. 1.00 ( PS ) <br /> Grade adjustment.. 1.60 (Cat tbl) <br />Avg. push gradient: 25.00 i (neg) Altitude adj. .... 1.00 (Cat tbl) <br /> "" ""` Material weight... 1.00 (Cat tbl) <br />Avg. stte altitude: 6500 ft. Blade type........ I.00 (S or U) <br />Material weight 2300.00 lb/LCY Net Job Correction 1.00 <br />Mat. Descr.: -__.___-_ _____ ________ <br />GENERAL FILL AdJusted Unit Prod.: 872.15 LCY/nr <br /> AdJusted Fleet Production: 1144.29 LCY/hr <br />JOB COST ---- ---.____ <br />Fleet size : 2 Do:er(s) Tota! Job lime: 25.08 Hours <br />Unit Cast 50.183 /LCY total Job Cost: 58,010 <br />