Laserfiche WebLink
<br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - SCRAPER WORK <br />TA °,K N0. C'2 PREP. BY: HBR PERMIT NO. C-B1-000 <br />GATE 10/29/93 FILENHNE: 0000-^< OPERATION: Gec <br />PERMIT ACTION aml reclamation <br />TASK DESCRIPTION ;topsoil east pit <br />HOURLY EQUIPMENT COSTS: <br />Single, Double or Triple <br />County: FRENONT Labor Zone 1 Shifts S <br />Equipment Descriptions <br />Scraper team make-up :CAf 6278 with ROPS cab <br />Road maint. - Grader :N/A <br />- Water T. :N/A <br />Scrap er Tearn Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equipment Filename:6278-ROP N/A N/A <br />Utilization on fob: 100% N/H N/A N/A <br />Cost Breakdown: <br />Ownership Cost/hr: $36.27 N/A N/A N/A <br />Operating cost/hr: $56.75 N/A N/A N/A <br />Operator cost/hr: $20.56 <br />- <br />- N/A N/A N/A <br />--- <br />----- <br />Unit subtotals: ----- <br />- <br />$113.58 -------- <br />N/A --------- <br />N/A - <br />N/A <br />Scraper team subtotal $227.16 Maint. subtotal N/A <br />Total Work Team Cost/Hr: $227.16 <br />MHTERIAL QUANTITIES: <br />Beg. <br />`Jolume: 42000 LCY <br />Cu.Yd. `````~``` Swell Loose <br />Volume: 42,000 LCY Factor: NjA Volume: 42,000 LCY <br />Source of quantity take-off:na <br />Source of est. swell factor:na <br />