My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55487
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:29 PM
Creation date
11/23/2007 10:29:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
5/20/1994
Doc Name
GEC RECLAMATION PROJECT RN-COAL-MINES-8 WEST PIT DIVERSION
From
DMG
To
KESSLERS RECLAMATION
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..~ <br />c . ~. <br />:° <br />Please provide the Division with a new cost of rip-rap <br />material per cubic yard. The Division estimates that a <br />minimum of 538 cy of rip-rap is needed for the specified <br />design. Please include a cost for the minimum rip-rap <br />needed (538 cy) as well as a line item cost of rip-rap <br />per cubic yard. In the original bid submitted by <br />Kessler's Reclamation, $20/cy was the price for <br />additional rip-rap. Please notify the Division if this <br />rip-rap cost has changed. Any additional funds remaining <br />will be used for additional rip-rap in the channel, or <br />will be used as a junction in Magpie Creek (at the <br />direction of the project manager). <br />4. Please delineate the remaining cost for earth work <br />associated with the ditch design (not including magpie <br />creek above, please do that separately). <br />As I stated on the phone, the Division needs these figures as soon <br />as possible to determine what modifications to the design must be <br />made. Energy Fuels and Dr. Corley will be consulted once these <br />figures are reviewed by the Division. Please line item each task <br />mentioned above as well as the total cost for the job. I would <br />appreciate an immediate response to this letter so the remaining <br />details with EFCI and Dr. Corley can be resolved. <br />If you have any questions or comments, please do not hesitate to <br />call. <br />Sincerely, <br />C~ S- ~~'~ <br />Erica S. Crosby !~ <br />Project Manager <br />cc: Larry Routten <br />David Berry <br />m:\coal\esc\gec\940520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.