Laserfiche WebLink
<br />..~ <br />c . ~. <br />:° <br />Please provide the Division with a new cost of rip-rap <br />material per cubic yard. The Division estimates that a <br />minimum of 538 cy of rip-rap is needed for the specified <br />design. Please include a cost for the minimum rip-rap <br />needed (538 cy) as well as a line item cost of rip-rap <br />per cubic yard. In the original bid submitted by <br />Kessler's Reclamation, $20/cy was the price for <br />additional rip-rap. Please notify the Division if this <br />rip-rap cost has changed. Any additional funds remaining <br />will be used for additional rip-rap in the channel, or <br />will be used as a junction in Magpie Creek (at the <br />direction of the project manager). <br />4. Please delineate the remaining cost for earth work <br />associated with the ditch design (not including magpie <br />creek above, please do that separately). <br />As I stated on the phone, the Division needs these figures as soon <br />as possible to determine what modifications to the design must be <br />made. Energy Fuels and Dr. Corley will be consulted once these <br />figures are reviewed by the Division. Please line item each task <br />mentioned above as well as the total cost for the job. I would <br />appreciate an immediate response to this letter so the remaining <br />details with EFCI and Dr. Corley can be resolved. <br />If you have any questions or comments, please do not hesitate to <br />call. <br />Sincerely, <br />C~ S- ~~'~ <br />Erica S. Crosby !~ <br />Project Manager <br />cc: Larry Routten <br />David Berry <br />m:\coal\esc\gec\940520 <br />