Laserfiche WebLink
<br />Table 3 (revised) <br /> <br />LAGGED DEPLETIONS AND PROPOSED REPLACEMENTS <br />Dsltramo Mlne Plt <br /> 1 2' 3 (41 5) <br />Water Year <br />1999 <br />Month Net <br />Evaporative <br />Losses Total <br />Operational <br />Losses Total <br />Losses <br />from Pit Equilibrium <br />Lagged <br />Stream <br />De lotions <br />Proposed ' <br />Replacefnenta <br /> (acre-feet arse-feet (acre-!set (acre-feel) acre-feet! <br /> Table 1, Col (8) at;le 2, Col 6 1)+(2) <br /> <br />August 0.42 0.94 1.38 1.21 1.25 <br />September 0.35 0.94 1.29 t21 1.25 <br />October C.25 0.69 0.94 ?.15 t.15_ <br />o~~ember 0.14 0.69 ~ _ <br />0.83 1.04 1.05 <br />December 0 09 0.69 0.78 C.97 1.00 <br />Janua 0.10 0.00 ~ 0.10 0.82 0.85 <br />Februa 0.12 0.00 0.12 0.80 0.65 <br />March 017 C.69 0.8G 0.62 0.65 <br />A ril _ 0.31 0.94 1.25 C.82 ~ 0.80 <br />May 0.41 0.94 135 1.00 1.00 <br />June 0.51 0.94 1.45 t.11 1.15 <br />July 0.47 G.94 1.41 1.19 ,120 <br />_-_,. . <br />Total 3.34 8.40 11.74 11.74 14.00 <br />Notes: <br />(4) Year 10 results from Stream Depletion Model scaled up by (11.74 ~ 10.8313) <br />?•apa:ed by RocFy h!o~n:ain Con~ullanb, Inc. Printed i5•Jul-00 G U748_00!!nrtic~ta6lea.wbJ <br />r., . ~nn•nu iv. nt nn ['n JJU FfF OCQO `i~ClT ~1~}' <br />