Laserfiche WebLink
<br /> <br />•••w••w•awaaa•aN kfa•a•wia•rr•a••rrra•w•ua•aaaaaa•••f•••••r•••a•••aarr•••a••a•a <br />STREAM DEPLETIO4I USING GLOVER TECHNIQUES <br />Beltraro Mine Pit - 2000 Plan Year Renewal <br />Lagged Stream Depleciore <br />FEH. 11, 1000 <br />aa•raaiiaaaaaaaa••r••••••raa•iiiaai•••r•.ra••aauaaa•ataa•asaasaaa•a••••a•ra••a• <br />STREA+t <br />O WELL <br />9DF. 65 DAYS <br />NOT DRAWN TO SCALE <br />PUMPING SCHEDULE <br />TOTAL TIME SIMULATED= 122 MONTHS <br /> VOL. PUMPED CUM. VOL. <br />PUMPING Q LENGTH CUM. TIME THIS PERIOD PUMPED <br />PERIOD IGPDq IMONTH9) (MGNTHS) (ACP.E-FEET) (ACRE-FEET) <br />1 6.547 1 1 0.880 0.980 <br />2 7.291 1 Z 0.980 1.860 <br />] 8.035 1 3 1.080 2.940 <br />q 7,73'1 1 4 1.040 7.579 <br />S 7.755 1 5 0.990 4.959 <br />6 5.844 1 6 0.920 5.889 <br />7 6.100 1 7 0.820 6.709 <br />8 3.41: 1 9 0.460 7.169 <br />9 3.050 1 9 0.410 7.5'9 <br />10 3.125 1 LO 0.420 7.999 <br />11 3.273 1 11 0.440 8.439 <br />11 3.845 1 12 0.490 8.929 <br />13 6.547 1 13 0.880 9.809 <br />14 7.291 1 14 0.980 10.799 <br />15 9.035 1 15 1.090 11.BG8 <br />16 7.737 1 15 1.040 12.908 <br />17 7.355 1 17 0.990 '13.898 <br />18 5.844 1 18 0.920 14.818 <br />9eit ramp Mi r.e ptt, 2004 Alan 'tear aenawat ease 1 c:\] 749 002. cnc\02a300t.•aaA <br /> <br />