Laserfiche WebLink
• `~~0 ~• <br />;C E <br />obillard `" <br />& Associotes, Inc. ~ `°°~~~` <br />Consultinc7 I_ligineers Land Surveyors Planners • Construction Managers <br />July 8, 1982 <br />Mr. Jcott Patten, Vice President <br />Flatiron Companies <br />P. O, Gox 224 <br />Boulder. CO 80306 <br />Subject: Inspection Report <br />Walden Coal Company <br />Our Project No: 82-018-01 <br />Dear Scott: <br />We I~;ive made another on site inspection of the subject operations as <br />rel,jl.cd to the land reclamation involvement. We note that the opera- <br />ti~~na is continuing to fill the east dump area. All work is being <br />perioi7ned to common and acceptable standards with no deficiencies noted. <br />Tfii~ inspection was made on July 1, 1982. <br />We n`ill perform the necessary surveying of the C pond dam on or about <br />Jule 15th as requested by tfie mine superintendent and also obtain the <br />nec.;ss,;ry shrink/swell information as soon as possible. <br />Verb i.ruly yours, <br />RO;;I.LARD & ASSOCIATES, IN <br />. ~ <br />~- I <br />. ~ ~ f___. <br />No~~:tigi~ L, Ringhand P.E. <br />Ma~;~„r of Engineering <br />NLF ,ih <br />P.O. Box2117 105 Dillon Mall Phone 303-468-6281 <br />Dillon. Colorodo ~~.~» 3rd Floor, Dillon Bldg. Denver Direct 303-623-0426 <br />