Laserfiche WebLink
Stipulation No. 19 <br /> THE DIVISION DIRECTS MCC, AS A PORTION OF ITS SUBSEQUENT PERMIT APPLICATIONS <br /> FOR THE MINE, TO SUBMIT REVISED SUBSIDENCE EVALUATIONS. THE SUBSIDENCE <br /> EVALUATION FOR EACH PERMIT PERIOD REQUESTED SHALL INCORPORATE THE RESULTS OF <br /> SUBSIDENCE MONITORING AND THE LANDSLIDE STABILITY STUDIES COMPLETED TO DATE, <br /> AS STIPULATED ABOVE. PARTICULAR ATTENTION SHALL BE FOCUSED UPON DESIGNATED <br /> SAFE AREA BUFFERS, TO BE OBSERVED IN FUTURE MINING BENEATH CRITICAL AREAS, <br /> INCLUDING THE DRY FORK OF MINNESOTA CREEK, AND BEAVER RESERVOIR AND THE <br /> LANDSLIDE DEPOSITS ADJOINING IT. THE AMENDED SUBSIDENCE EVALUATIONS SHALL <br /> INCLUDE THE PROPOSAL OF APPROPRIATE SUBSIDENCE MONITORING NETWORKS WITHIN <br /> EACH OF THESE DESIGNATED AREAS. <br /> STATUS: Future <br /> Stimulation No. 21 <br /> THE APPLICANT MUST INSTALL MONITORING WELLS IN, CONDUCT PUMPING TEST ON, AND <br /> MONITOR WATER LEVELS AND WATER QUALITY IN THE ALLUVIUM OF DRY FORK, LICK <br /> CREEK, SOUTH PRONG.AND HORSE CREEK ONE YEAR PRIOR TO MINING WITHIN THE <br /> WATERSHEDS OF THESE STREAMS. THE APPLICANT SHALL SUBMIT TO THE DIVISION THE <br /> DATA AND RESULTS OF THESE TESTS AND MONITORING ALONG WITH PROJECTED IMPACTS <br /> PRIOR TO CONDUCTING MINING WITHIN ANY OF THE WATERSHEDS. <br /> STATUS: Future <br /> Stimulation No. 57 <br /> WITH SUBMITTAL OF PERMIT REVISION NO. 6, MOUNTAIN COAL COMPANY HAS <br /> REMOVED ALL PERMIT DOCUMENT REFERENCES TO MINING BENEATH THE DRY FORK OF <br /> MINNESOTA CREEK INTERMOUNTAIN DIVERSION AND RESERVOIR SYSTEM, INCLUDING <br /> REFERENCES TO BUFFER AREAS AND ASSOCIATED SUBSIDENCE CONTROL PLANS. <br /> PREVIOUSLY APPROVED SUBSIDENCE CONTROL PLAN DOCUMENTS ARE MAINTAINED IN <br /> THE DIVISION'S FILES. <br /> THE DIVISION HAS NOT, AND WILL NOT, APPROVE ANY MINING WHICH WILL <br /> POTENTIALLY AFFECT THE DRY FORK OF MINNESOTA CREEK INTERMOUNTAIN DIVERSION <br /> AND RESERVOIR SYSTEM, INCLUDING ALL PREVIOUSLY DESIGNATED BUFFER AREAS, <br /> UNTIL AN APPROPRIATE SUBSIDENCE CONTROL PLAN IS SUBMITTED AND APPROVED. <br /> STATUS: Future <br /> 3 <br />