My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55377
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:24 PM
Creation date
11/23/2007 10:18:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
1/12/1981
Doc Name
Proposed Decision and Findings of Compliance
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO aIG HARD D. l Gavwnc~ <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive D~rec[or <br />iVIL'~IED LAND RECLAi~1A'I'ION <br />d23 Centennial Building. 1313 Sherman Street <br />Denver, Colorado 80203 Tel.(30~) 839-3567 <br />David C. Shelton <br />Director <br />January 12, 1981 <br />PROPOSED DECISION <br />Kerr Coal Company <br />Marr Strip, Marr Prep Plant <br />The Colorado Division of Alined Land Reclamation proposes to approve with stipu- <br />lations an application for a permit to conduct coal mining submitted by Kerr <br />Coal Company for the Marr Strip and Marr Prep Plant. <br />This approval decision is based on a finding that the proposed operation will <br />comply with all requirements of the Colorado Surface Coal Mining Reclamation <br />Act, C.R.S. I973 34-33-I01 et.seq., and the Rules promulgated thereunder. <br />The finding of compliance, and the stipulations which are a part of this <br />approval, are attached to this document. <br />The permit cannot issue until alt statutory notice and public comment require- <br />ments have been satisfied, and until bond for the first bonding increment, <br />which has been set at 54,290,800.OQ.has been posted. The Tipple area will <br />continue to be bonded separately at the present level, which is 533,000.00. <br />The tipple area coill continue to be bonded separately at the present level, <br />which is $33,000.00. <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.