Laserfiche WebLink
C. Project Description. Describe all aspects of the operation including mining milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, <br />power requirements, how clearing will be accomplished, topsoil stockpile, waste rack <br />placeme~, tailings disposal, proposed number of drill holes and depth, depth of proposed <br />suction dredging, and how gravels will be replaced, eta Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. <br />(If more space is needed to fill out a block of information, use adc&tional sheets and attach to form ) <br />6-hours per day. Other hand dieeins and mineral extraction will take place all season until wider. <br />Topsoil will be searrppted and used to top-off bacld-ills to the oriig pal depth in those areas where <br />'This will averaee about 15 feet in any~iven prospect or excavation, but can reach 30 feet. <br />crystals per season. MecLamzed equrpment u useQ to expose the pockets only. t•ollowmg drscovery, <br />all crystals are carefully collected by hand, wrapped in paper. and transported from site. <br />Settlinaponds are not applicable to this operation. <br />considered part of this operations plan. <br />