Laserfiche WebLink
Addendum l to Glacier Peak and Crystaljack Plan of Operations <br />~II'. DESCRIP~I()Nf1FTHEOPF~4TI©N <br />A_ _ Access. Shaw on a ~ {USA:S ~'~ ~'_e ~ or a i`?a~o~ ~'u , for e_~~le) the <br />claim boundaries, if apptiarble, and all access needs such as roads and trails, on and off the <br />claim. Specify which Forest Service roads will be used, where maintenance ar recoastrnction is <br />proposed, and where new construction is necessary.' For new construction, include construction <br />specifications such as widths, grades, etc., lotttion and size o£ culverts, describe ma;~Pxeance <br />plans, and the type and size of vehicles and equipment that will rise the access routes. <br />«~,~ed" in. when needed_ to the mining or prosoeet sites. <br />forest system road tF,S. Rd 753). <br />crowns to~revent ~iliies. Additionally. if deemed necessary alone transverse slopes greater tbaa <br />would be limited to three. 4-VJD vehicles and the track hoe used during active mie;nv_ <br />