Laserfiche WebLink
escribe the measures to betaken for release of a reportable quantity of a hazardous material or <br />the release of a toxic substance. This includes plans for sp81 prevention, containment, <br />notification, and cleanup. <br />Additionally. the mined substances do not produce any toxic substances. <br />H. Reclamation. Describe the annual and final reclamation standards based on the anticipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a ~ revegetation plan, permane~ <br />containment of mine tailings, waste, or sludges which pose a threat of a release into ifie <br />enviromnem, closing ponds and eliminating standing water, a final surface shaping Plan, and <br />post operations monitoring and maintenance plans. <br />d ~ nits. trenches. and excavations within the immediate area of operations will also be reclaimed. <br />degrading bacteria. <br />