Laserfiche WebLink
<br />Mr. Hank Coufos - 2 - May 9, 1985 <br />Y. <br />STIPULATION N0. 61 <br />ANNUAL INFLOW STUDY TO BE ACCOMPLISHED IN JUNE OF EACH YEAR. .THIS REPORT IS <br />TO B~SUBMITTED ANNUALLY TO THE DIVISION BY THE FIRST OF AUGUST. <br />STIPULATION N0. 7 <br />ANNUAL HYDROLOGIC REPORT DUE BY JANUARY OF EACH YEAR. <br />STIPULATION N0. 8 <br />THE INFORMATION. TO FULFILL THIS STIPULATION MUST BE SUBMITTED BY THE PERMITTEE <br />AT LEAST 60 DAYS BEFORE PUMPAGE OF ALL WATER CEASES FROM RIENAU N0. 2 MINE. <br />THIS STIPULATION IS BASED UPON A WORST CASE ASSUMPTION THAT THE INFLOWS INTO <br />THE RIENAU N0. 2 MINE ARE EMINATING FROM A FRACTURE SYSTEM CONTACTING THE <br />SURFACE WATER AND ALLUVIAL WATER OF CURTIS CREEK. NORTHERN COAL IS PRESENTLY <br />CONDUCTING AN INFLOW STUDY INTO THE MINE WHICH WILL AID IN CLARIFICATION OF <br />SOURCE OF INFLOW INTO THE MINE. THE RESULTS OF THIS STUDY COULD PROVE THE <br />NEED FOR REDUCING OR ELIMINATING THE REQUIREMENTS OF THIS STIPULATION. ALSO <br />AFFECTING THIS STIPULATION, THE OPERATOR IS PRESENTLY FLOODING THE SECOND EAST <br />MAINS WHILE CONTINUING PUMPAGE FROM THE OTHER h1AINS TO THE SURFACE WATER <br />SYSTEM. FLOODING OF SECOND EAST WILL HELP TO RECHARGE THE AQUIFER AND <br />MITIGATE ANY EFFECTS TO SURFACE WATER DEPLETION. <br />STIPULATION N0. 9 <br />EXTENDED TO OCTOBER 1, 1485 TO ENABLE THE OPERATORS TO SAMPLE AND ANALYZE <br />REPRESENTATIVE TOPSOIL AT THE REINAU N0. 2 MINE. <br />STIPULATION N0. 10 <br />INFORMATION WAS SUBMITTED BY THE OPERATOR BY THE STIPULATION DEADLINE. THE <br />DIVISION WILL REVIEW THE INFORMATION. <br />STIPULATION N0. 11 <br />THE DIVISION HAS SET VEGETATION SUCCESS STANDARDS. (SEE ATTACHED MEMO FROM <br />MIKE SAVAGE). <br />STIPULATION N0. 12 <br />INFORMATION HAS BEEN SUBMITTED BY THE OPERATOR BY THE STIPULATION DEADLINE AND <br />MUST BE REVIEWED BY THE DIVISION. <br />STIPULATION N0. 13 <br />SATISFIED. <br />