<br />-s- <br />23. THE APPLICANT SHALL OBTAIN RIGHTS-OF-WAY FROM BLM PRIOR TO THE CONSTRUCTION <br />7 OF OFF LEASE ROADS, TRANSMISSION LINES, WATER LINES, AND FACILITIES AND FOR <br />THIRD PARTY FACILITIES ON THE LEASES. <br />24. COMPANY HAS NOT SL~MITTED ADEQUATE INFORMATION ON MULE DEER AND ANTELOPE <br />M,ZGRATION PROBLEMS THROUGH TXE AREA OF DISTURBANCE. IN ORDER TO DEVELOP <br />PROPER MITIGATION PLANS FOR TXE PROTECTION OF THE INTEGRITY OF MIGRATION <br />/ ROUTES BRIEFLY IDENTIFIED IN BLM'S FINAL EIS ON THE MOON LAKE PROJECT, THE <br />FOLLOWING STIPULATION HAS BEEN DEVELOPED: THE APPLICANT MUST SUBMIT TO TXE <br />REGULATORY AUTHORITY THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE <br />MIGRATION CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL. THE REGULATORY AUTHORITY <br />IN CONSULTATION WITH STATE AND FEDERAL GAME MANAGEMENT AGENCIES WILL DETERMINE <br />ADEQUATE MITIGATION PROCEDURES. <br />25. DUE TO POOR WEATHER CONDITIONS THE APPLICANT'S SURVEY FOR SAGE GROUSE <br />LEK ACTIVITIES WERE UNSUCCESSFUL. A SURVEY IS BEING CONDUCTED IN SPRING OF <br />1981 TO DETERMINE IF ANY LEKS DO OCCUR IN TXE AREA TO BE DISTURBED. THEREFORE, <br />BEFORE RNY EVALUATION CAN BE INITIATED THAT SURVEY MUST BE SUBMITTED. 4fITXIN <br />30 DAYS OF THE MINE PLAN APPROVAL, THE APPLICANT SHALL SUBMIT TO TXE REGULATORY <br />AUTHORITY TXE RESULTS OF THE LEK SURVEY AND WHAT MITIGATION PROCEDURES WILL <br />BE USED TO MINI142ZE IMPACTS TO SAGE GROUSE AND THEIR HABITATS. <br />26. ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS ADJACENT TO THE MINE <br />SITE MUST BE PROVIDED. THEREFORE, THE FOLLOWING DESCRIBED LANDS ARE CLASSIFIED <br />~. AND UNSUITABLE FOR SURFACE DISTURBANCE AND OCCUPANCY. PERIODIC ACTIVITY DURING <br />THE NON-NESTING SEASON (JUNE 1 - FEBRUARY 28J WITHIN THE BUFFER ZONE CAN BE <br />APPROVED ON A CASE BY CASE BASIS: <br />FEDERAL LEASE D-097201 <br />T.2N., R.lOW., 6th PM <br />Sec. 3: SffSE~! <br />Sec. 10: NE~NE~r <br />FEDERAL LEASE C-023703 <br />T.2N., R.10W „ 6th PM <br />Sec. 3: E~J SEA SW~r <br />27. UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL SUBMIT WITHIN <br />~ 30 DAYS PLANS FOR CONSTRUCTION OF POI•IERLINES USING APPROVED GUIDELINES FOR <br />RAPTOR PROTECTION, <br />28. fT.'ON APPROVAL OF DEPARTfENTAL ACTION THE OPERATOR WILL COMAfIT WTTHIN <br />30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED PY Tvc n`GULA:ORY <br />AUTHORITY RND TO FENCE RNY PONDS THAT CONTAIN TOXIC MATERIALS. <br />29. A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE CONSTRUCTION AND OPERATION <br />CAN BEGIN. <br />