Laserfiche WebLink
<br />Section Topic <br />Variances from <br />2.06.5(3)(c) approximate original <br />contour for steep slope <br />mining <br />Reclamation delay at <br />2.06.7(5) combined <br />surface/subsurface <br />mines <br />3.02.2(4) Adequacy of bond <br />amount and terms <br />Applicability at the <br />Hamilton Mine <br />Inapplicable, no <br />such variances. <br />Inapplicable, no <br />delay has been <br />requested or <br />approved. <br />Applicable. <br />Midterm Review Methodolot!v <br />For this Midterm Review, the Division reviewed the following documents: <br />1. Permit application, including stipulations and responses; <br />2. Revisions made to the permit since the last permit renewal; <br />3. Annual reclamation and hydrology reports; <br />4. Bond surety and reclamation cost estimate; <br />5. Division findings documents and previous Midterm Reviews; <br />6. Division inspection reports; <br />7. Notices of violations since last perrnit renewal, if any. <br />King Coal Mine Page 3 February 18, 2005 <br />Midterm Review <br />