My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55149
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:13 PM
Creation date
11/23/2007 10:05:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/26/1997
Doc Name
GEOTECHNICAL REPORT SYLVESTER GULCH SITE DEVEOLPMENT 6/7/97 - 6/22/97
From
MOUNTAIN COAL CO
To
MLR
Permit Index Doc Type
EXPLORATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III Illllllllllll 111 <br />Mountain Coal Company <br />West Elk Mine <br />Post Office Box 591 <br />Somerset, Coloratlo 81434 <br />Telephone 970 929-5015 <br />Fax 970 929-5595 <br />June 23, 1997 <br />Dr. Jim Pendleton <br />Colorado Division of Minerals & Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />JUN 2 6 ~g97 <br />Division of Minerals 8 Geology <br /> <br />Re: Geotechnical Report -Sylvester Gulch Site Development <br />Ref: Permit Revision 07 and Technical Revision 79 to Permit No. C-80-007 <br />Dear Dr. Pendleton: <br />The following presents Mountain Coal Company's (MCC) current summary of geotechnical <br />issues for the Sylvester Gulch Site Development Project, as required by Permit Revision 07. <br />Although not required, similar related information pertaining to the Refuse Pile Expansion (RPE) <br />project (TR79) and various Minor Revisions is also included. The following information covers <br />the time period from June 7, 1997 -June 22, 1997. <br />General Construction Summary <br />Construction of the RPE Ponds (TR79) is 90% complete. Topsoil stripping at the RPE was <br />completed, with all topsoil going to the North Soil Storage area. Phase lA and Phase IB were <br />partially excavated to build pond berms and level the Phase lA area. The Shaft #1 and #2 azea, <br />Substation azea (PR07), and Shaft #3 road alignment (MR216} have been cleazed and logged and <br />topsoil stripping is in progress. The light-use road to Landing #2 was pioneered to Station <br />48+50. The Dewatering Borehole Pad and Road (MR212) are complete. Significant rain <br />occurred June 7 through June 9, which halted construction on June 9. Additional small rain <br />events occurred daily through June 16. <br />Field Monitoring and Observations <br />RPE: Partial slope excavations within Phase lA and iB are stable at approximately 4:1. Site <br />lines above the cut slopes will be established next week before major excavation commences. <br />No soft spots or water has been observed from the known springs uphill (south) of the <br />excavation. Old slumped areas observed on the north side of RPE Pond Cell B (in the <br />highway embankment) were inspected on June 19. This material was found to be loosely <br />compacted, very moist, clay material. This material was over-excavated and removed <br />(approximately 60 CY) and back-filled with structural fill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.