Laserfiche WebLink
ARCO Caal Con7pany <br />{~•.f i.ll l', dll~ nt{16di L.c lauu~l <br />5% Seventc., h Slrcel <br />M.i fling Address: Box 5100 <br />Denver, Colorado 00277 <br />"Cel.phone 909 575 7500 <br />~ III IIIIIIIIIIIII~III <br />ft.E; ~ ;+ I:luZ <br />February 5, 1982 <br />Mr. Tom Gillis <br />Mined Land Reclamation Division <br />Colorado Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Tom: <br />` ~ ~fh1N <br />Cole. U~:!,i. n. r,~,,;,,,,,; ri i;::nUCLE'; <br />The enclosed pages numbered 4-29, 4-30, and 4-30a (revised January 31, 1982) are <br />submitted to you in response to CMLRD Stipulation 8 and OSM Stipulation 3 <br />(second part). These stipulations were issued as part of the permits granted to <br />Atlantic Richfield for its Mt. Gunnison No. 1 Mine in July, 1981. These stipulations <br />require that within six months of permit issuance, ARCO must submit a plan for <br />monitoring the agricultural usage and productivity of the North Fork AVF. Using <br />the attached survey form, ARCO intends to interview individuals farming land <br />within the North Fork AVF during the 1982 growing season. <br />Please remove the existing pages numbered 4-29 (revised April 3, 1981) and 4-30 <br />(revised January 30, 1981) and replace with the three enclosed pages. <br />The furnishing of this material does not constitute an admission that the same is <br />required by law nor does Atlantic Richfield Company hereby admit that its permit <br />applications or the permits granted for its Mt. Gunnison No. 1 Mine are now or at <br />any time were in any manner defective, deficient, incomplete or not in compliance <br />with the requirements of law. <br />Sincerely, <br />Paige B. B-eville <br />Senior Permits Coordinator <br />Permits and Compliance <br />Enclosures <br />cc: T. F. Linn/DAT 1871 <br />P. H. Haller/DAT 1865 <br />R. Benson/Holland be Hart <br />L. G. Kline/DLT 1136 <br />W. Swain/OSM <br />PBB/blh <br /> <br />