Laserfiche WebLink
<br />Trinidad Basin Mine Project <br />Bid Schedule <br />PKA-9-440 <br />Item 2 -Reclamation Tasks: <br />Task <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />B <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />Description <br />Remove pond 15-P1 <br />Remove Diversion 15-D1, Realign Diversion 15-D3 <br />Realign stream channel in Section 15 <br />Restore spillway on Pond 15-P2 <br />Grading & culvert maintenance on east-west access road <br />Install single fence rock check dam on east-west access road <br />Install rip-rap in channel south of Pond 15-P2 <br />Partial removal of diversion ditch 22-D4 <br />Gully repair on north-south access road <br />Install road dips on north-south access road <br />Remove culverts on north-south access road <br />Reseeding slope in section 22 <br />Reseeding slope and weed spraying in section 15 <br />Revegetation, per specs <br />Total (Enter here and on Page 1 of Bid Schedule, Item 2) <br />Bid Amount <br />S <br /> <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 2 of 2 Pages <br />