Laserfiche WebLink
<br />Permit Number CO-032, 12/83 <br />~ Page 2 of 7 <br />~ '. <br />~~. <br />. J~ <br />T. 13 S., R. 91 W., 6th PM <br />sec. 1, all of lots 1, 2, 3, 4, S1/2NW1/4, 5::1/4, <br />see. 2, Si11/4NiJ1/4; portions of the following: N1/25H1/4, SE1/4,NE1/4 <br />sec. 3 portions of the following: NE1/4, N1/25E1/4 and NE1/4NW1/4; <br />sec. 11, portions of E1/2NE1/4;. <br />sec. 12, portions of the following: S1/2NE1/4, E1/25E1l4, NW1/4, <br />SW1/4; <br />sec. 13, portions of the following: N1/2NE1/4 and lot 1. <br />The following described Federal lands are contained in the State's <br />permit area, however, these lands are excluded is the Federal permlt <br />area. Coal extraction and surface activities shall not be performed <br />in these areas because the permittee does not have the legal right to <br />enter. <br />T. 12 S., R. 90 W., 6th PM <br />sec. 31, portions of lots 12, 13, sad 14, this area results from the <br />application of a 30° angle of draw to the permit area. <br />T. 13 S., R. 90 W., 6th PM <br />sec. 5, portion of lot 8, this area results from the application of a <br />30° angle of dray to the permit area. <br />~ sec. 6, lots 9 and 14 (W1/2NE1/4) this area is lease application No. <br />C-36446, lots 8 and 15 (E1/2NE1/4) this area results from the <br />application of a 30° angle of dray to the permit area, <br />Moreover, the permittee is authorized to conduct surface and <br />reclamation operations connected with mining on the foregoing <br />described property subject to the conditions of the leases, the <br />approved mining plan, and Colorado State permit C-022-81, including <br />all conditions, and all other applicable conditions, lays and <br />regulations. <br />Sec. 3 This permit is Sssued for a term of 5 years commencing oa the date the <br />permit is signed by tha permittee, except that this permit ;till <br />Germinate if the permittee has not begun the surface coal wining and <br />reclamation operations covered herein within 3 years of the date of <br />issuance. <br />Sec. 6 The permie rights nay not be transferred, assigned, or sold without <br />the approval of the Director, OSM. Request for transfer, assignment, <br />or sale of permit rights must be done in accordance with 30 CFR <br />740.13(e). <br />~~ <br />