<br />Permit Number CO-032, 12/83
<br />~ Page 2 of 7
<br />~ '.
<br />~~.
<br />. J~
<br />T. 13 S., R. 91 W., 6th PM
<br />sec. 1, all of lots 1, 2, 3, 4, S1/2NW1/4, 5::1/4,
<br />see. 2, Si11/4NiJ1/4; portions of the following: N1/25H1/4, SE1/4,NE1/4
<br />sec. 3 portions of the following: NE1/4, N1/25E1/4 and NE1/4NW1/4;
<br />sec. 11, portions of E1/2NE1/4;.
<br />sec. 12, portions of the following: S1/2NE1/4, E1/25E1l4, NW1/4,
<br />SW1/4;
<br />sec. 13, portions of the following: N1/2NE1/4 and lot 1.
<br />The following described Federal lands are contained in the State's
<br />permit area, however, these lands are excluded is the Federal permlt
<br />area. Coal extraction and surface activities shall not be performed
<br />in these areas because the permittee does not have the legal right to
<br />enter.
<br />T. 12 S., R. 90 W., 6th PM
<br />sec. 31, portions of lots 12, 13, sad 14, this area results from the
<br />application of a 30° angle of draw to the permit area.
<br />T. 13 S., R. 90 W., 6th PM
<br />sec. 5, portion of lot 8, this area results from the application of a
<br />30° angle of dray to the permit area.
<br />~ sec. 6, lots 9 and 14 (W1/2NE1/4) this area is lease application No.
<br />C-36446, lots 8 and 15 (E1/2NE1/4) this area results from the
<br />application of a 30° angle of dray to the permit area,
<br />Moreover, the permittee is authorized to conduct surface and
<br />reclamation operations connected with mining on the foregoing
<br />described property subject to the conditions of the leases, the
<br />approved mining plan, and Colorado State permit C-022-81, including
<br />all conditions, and all other applicable conditions, lays and
<br />regulations.
<br />Sec. 3 This permit is Sssued for a term of 5 years commencing oa the date the
<br />permit is signed by tha permittee, except that this permit ;till
<br />Germinate if the permittee has not begun the surface coal wining and
<br />reclamation operations covered herein within 3 years of the date of
<br />issuance.
<br />Sec. 6 The permie rights nay not be transferred, assigned, or sold without
<br />the approval of the Director, OSM. Request for transfer, assignment,
<br />or sale of permit rights must be done in accordance with 30 CFR
<br />740.13(e).
<br />~~
<br />
|