Laserfiche WebLink
PART I Page 5 of 20 <br />Permit No. COR-040000 <br />A. COVERAGE UNDER THIS PERMTT (cont.) <br />5. Individual Permit Criteria <br />Aside from the operation type, the Division may use other criteria in evaluating whether an individual permit is <br />required instead of this general permit. This information may come from the application, SWMP, or additional <br />information as requested by the Division, and includes, but is not limited to, the fallowing: <br />a. the quality of the receiving waters (i.e., the presence of downstream drinking water intakes or a high quality <br />fishery, or for preservation of high quality water); <br />b. [he type of mining operation, including pollution potential; <br />c. the volume and type of materials handled; <br />d. the size of the facility; <br />e. evidence of noncompliance under a previous permit for the operation; <br />f. the use of chemicals within the stormwater system. <br />In addition, an individual permit tray be required when the Division has shown or has reason to suspect that the <br />stormwater dischazge is a significant contributor of pollutants to waters of the State. <br />6. Permit Expiration Date <br />Authorization to dischazge under this general permit shall expire on September 30, 2001. The Division must <br />evaluate and reissue this general permit once every five yeazs and must recertify the applicant's authority to <br />dischazge under dte general permit at such time. Any permittee desiring continued authorization under the general <br />permit must reapply by Lune 30, 2001. The Division will determine if the applicant may continue to operate under <br />the terms of the general permit. An individual permit will be required for any faclliry not reauthorized to dischazge <br />under the reissued general permit. <br />B. STORMWATER MANAGEMENT PLAN -ACTIVE MINES <br />A Stormwater Management Plan (SWMP) shall be developed for the portion of each facility covered by this permit. The <br />SWMP shall be prepared in accordance with good engineering practices. (The plan need not be completed by a <br />registered engineer.) The plan shall identify potential sources of pollution (including sediment) which may reasonably be <br />expected to affect the quality of stormwater dischazges associated with the mining operation. In addition, the plan shall <br />describe and ensure the implementation of best management practices (BMPs) which will be used to reduce the pollutants <br />in stormwater dischazges associated with mining activity and to assure compliance with the terms and conditions of this <br />permit. <br />Permiriees must implement the provisions of their SWMP as a condition of this permft. The Division reserves the <br />right to review the plan, and to require additional meastrres to prevent and control pollution as needed. <br />SWMPs which met criteria in the previous version of this permit are acceptable <br />The SWMP for active mines shall include the following items, at a minimum: <br />Description of Mining AMivities <br />The plan shall provide a narrative description of the mining and associated activities taking place at the site which <br />affect or may affect stormwater runoff intended to be covered by this permit. The narrative description shall report <br />the total acreage within the [nine site and an estimate of the number of acres of disturbed azea. A general <br />description of the location of the mining site relative to major transportation routes and commuttities shall also be <br />provided. <br />