Laserfiche WebLink
PART I Page 15 of 20 <br />Permit No. COR-040000 <br />F. TERMINATION OF PERMIT COVERAGE (cont.) <br />2. Request for Termination <br />When a site has been reclaimed in accordance with the CDMG requirements and the site has been releazed from <br />State reclamation requirements, or the above Termination Criteria have been met, the permi[tee may request <br />certification termination. The Division will consider termination of permit coverage when: <br />a. the permittee has submitted a completed Inactivation Form az provided by the Division which summarizes the <br />work accomplished; <br />b. In the case of mine-waste remediation projects, the permittee haz submitted photographic documentation of the <br />post remediation conditions at the mine site; <br />c. All stormwater dischazges to state waters associated with mining activities have ceased and the permittee haz <br />demonstrated to the Division the termination criteria have been met or the CDMG performance bond has been <br />released; <br />d. The Division fords that the permittee has shown reazonable grounds consistent with the Federal and State <br />s[arutes and regulations for such termination; and <br />e. Fee requirements of Section 6.16.0 of State Discharge Permit System Regulations have been met. <br />Continued coverage may be required after reclamation or remediation has been completed if the Division has shown or <br />has reason to suspect that the stormwater dischazge may contribute to a violation of a water quality standard. <br />G. ADDITIONAL DEFINITIONS <br />1. Best management praMices (BMPs): schedules of activities, prohibitions of practices, maintenance procedures, <br />and other management practices to prevent or reduce the pollution of waters of the State. BMPs also include <br />treatment, operating procedures, and practices to conuol site runoff, spillage or leaks, waste disposal, or drainage <br />from material storage. BMPs include strucrural and nonstrucrural controls. <br />2. Operator: the individual who has day-today supervision and control of activities occurring at the mine site. <br />3. Remediation, az used in this permit, means actions taken to reduce or eliminate the overall adverse environmental <br />impact associated with a pollutant source. The term includes actions such as re-routing of surface flows, re-location <br />or a pollutant source, the addition of pollutant neutralizing or immobilizing substances, capping and re-vegetation. <br />4. Significant Materials include but are no[ limiced to: raw materials; fuels; materials such as me[allic products; <br />hazardous substances designated under section 101(14) of CERCLA; fertilizers; pesticides; and waste products such <br />az ashes, slag and sludge tha[ have the potential to be released with stormwater discharge. <br />5. Vegetative Cover is the aerial projection of all grasses, fortis, mosses (living or dead) onto the ground. <br />PART II <br />A. MANAGEMENT REQUIItEMENTS <br />1. Chance in Discharge <br />The permittee shall inform the Division (Permits and Enforcemen[ Section) in writing of any intent to construct, <br />install, or alter any process, facility, or activity that is likely to result in a new or altered discharge, and shall <br />furnish the Division such plans and specifications which the Division deems reasonably necessary to evaluate the <br />effect on the discharge and receiving s[ream. The SWMP shall be updated within 60 days of the changes. The <br />